  1. First of all we had to remove the kitchen and try to salvage it because it wasn’t bad. The client managed to get about $600.00 for it. That is money that is well needed in any renovation.
    The next thing was work logistics and soil extraction. We would either have to crane a 5tonne excavator over a two story house or use a smaller one which will take a bit longer. We went for the smaller option. The other excavator was at the front of the property loading the truck. All soil removed from the backyard was done by wheelbarrow. Around 50 to 60m3.