There was an existing deck which had waterproofing problems. The levels were wrong, with water falling towards the entry. The existing deck had to be stripped back to the joists , new joists put in and a bigger bearer and more steel posts. It was then re-sheeted, waterproofed and tiled. A clear roof was installed to allow sufficient light into the dining/living room and provide privacy from the unit complex next door.

Deck Building Coorparoo 1.1