Category Archives: Daisy Hill part 2

Task

The work requirements were the same as before. Plate up the existing beam and support it by two posts. The client borrowed one of my acro props and supported the structure as you see it. He then demolished the load bearing brick wall. All this was done after an engineer was contracted by him to re design the structure.

DSC00740

Process

I ordered the flat bar from my mates’ engineering shop, had it cut and the edges lenished.

On site we remeasured the lengths and primed the steel with an oxide undercoat. Steel posts were cut to size and plated top and bottom. The existing beam was plated in stages and then welded. Where the existing beam ended we laminated two lengths of pine the same size and used it as a packer. This was to prevent the steel from buckling or distorting when we were tightening up the bolts and when the building load would be applied. The holes were marked, drilled and bolted. The post were bolted and welded to the steel plates.

Finally we re painted the areas where I welded.

DSC00744

DSC00748

The Result

As you can see, all done. It is supporting the bedroom upstairs.

It took three of us nine hours to do. Unfortunately we started late because I was picking up materials.  Started around 12 noon and finished the job at 9pm in the evening. The client is nice and was cool about it, actually he was happy to have it done and so was I.

DSC00745

DSC00747