The heavy plated steel was plated on each side of the beam and the posts were cut and welded into place and bolted up. Everything was painted and ready to be sheeted over. There was no deflection at all. The job went like clock work, the customer was happy and it was mission accomplished. You always need to treat each job differently and you must always exercise caution. We were totally prepared before we started but we also had contingencies in place.