Category Archives: Clayfield

Task

We were booked by the client one year in advance to do works at their residence. The client wanted to be hands on with the job as much as possible but conceded that he needed trades people when it came to technical facets in building. We had to remove the existing roof structure at the rear of the house and build a new structure. This was to have the same pitch as the middle of the house.

existing roof clay

 

The client arranged the scaffolding through one of my clients and made the site as safe as possible. As well as installing new trusses and a roof the sides of the house were to be recladded because new powder coated double hung aluminium windows were installed.

 

The Process

Once the trusses were made we fixed all the top plates to the steel bearers with bolts. We marked out our spacings then started installing the trusses one by one.

DSC01445

It is important to brace your first truss well once it is in position and plumb. If you do that every thing just falls into place. Once we got to the old trusses we pulled them out one by one.  Note : where you have a girder truss make sure your connection points into the old part of the house are as solid as the new. Sometimes joist hangers need to be used with extra fixing points.

DSC01450

At the same time as I was sheeting the roof the windows were installed by a carpenter. Once the windows were placed in and fixed the two sides of the house were re cladded with new pine weather boards. Another subcontractor primed and painted everything.

DSC01481

 

There was one last thing that had to happen and that was to put in commercial glass stacker doors. The client wanted a seamless look where the track was hidden in the ceiling. So when the installers came in we had to pack out in-between the trusses so that the tracks had fixing points. I always fix ceiling battens but if we wanted uniformity with the old and new we had to fix straight to the bottom cords of the trusses.