Task

The work requirements were the same as before. Plate up the existing beam and support it by two posts. The client borrowed one of my acro props and supported the structure as you see it. He then demolished the load bearing brick wall. All this was done after an engineer was contracted by him to re design the structure.

DSC00740

Leave a Reply

Your email address will not be published. Required fields are marked *