The outcome was that the deck had more room and looked original as it matched the same height of the previous one. Four coats of decking oil were applied to enhance the look and longevity of the deck. You will see that the clients pets are also using the deck. Two new gates had to be built as the old ones were cactus.
Category Archives: Deck Building
Before And After
Demolition
Boxing, Levelling And Compacting
Harmonising The Structures With Surroundings
Task
Outcome
Task
There was an existing deck which had waterproofing problems. The levels were wrong, with water falling towards the entry. The existing deck had to be stripped back to the joists , new joists put in and a bigger bearer and more steel posts. It was then re-sheeted, waterproofed and tiled. A clear roof was installed to allow sufficient light into the dining/living room and provide privacy from the unit complex next door.