Excavation of vegetation alongside the house and footing prep began. Half of the deck is built on top of a slab which we had to build. Then the deck roof structure was supported by two H beams tied down through block work and steel posts.
The clients wanted to make a low deck to the front of the house and change the entry by installing two French doors as well as using the existing entry for the main entry and shoe storage.