The Reengineering Of The Deck

The clients wanted to reuse as much of the old deck as possible so we used the existing joists and decking. Bearers, pole plate and posts were replaced to specs. It was tricky work threading nine metre long steel posts through the deck. The only way this could be done was through mechanical means. The council was also involved with sewer modifications and inspections to approve the renovations of the pre existing deck.

Stafford Heights 3.1

Deck works posts 1

Installing posts

Stafford Heights 3.2

All in a days work

The one thing with building is that your day finishes when the task is completed. Sometimes it is not worth while doing a few hours the following day. You always need to ensure that there is integrity in the structure and you need to ensure that the site is safe before you go home. This is just common sense but it is also  legislative now. So here we are a twelve hour day.

jpg 20 stafford deck

A long days work

 

 

Task

I had to fully strip out the existing bathroom due to water damage and taps not sealing shut anymore. The requirements for the bathroom were that it needed a bath tub, a shower screen a large vanity mirror cabinet and also a place to put away cleaning solutions.

Runcorn Bathroom 2.1 before Bathroom 3.1 before Bathroom 4.1 before

The Process

The old shower tray was holding moisture and allowing water to penetrate into the fibre sheet. As you can see this it really needed replacing. Once the room was decontaminated the plumbing was updated with new copper pipes,wastes etc. The framing was done for the features and services. Electrical was also done before sheeting.

Tip. When sheeting always mark on the sheet where the services are so that you dont put a nail into them by accident.

Leaking shower floor 2 Floor sheeting step 1 Bathroom carpentry and plumbing DSC_0031