The clients wanted to reuse as much of the old deck as possible so we used the existing joists and decking. Bearers, pole plate and posts were replaced to specs. It was tricky work threading nine metre long steel posts through the deck. The only way this could be done was through mechanical means. The council was also involved with sewer modifications and inspections to approve the renovations of the pre existing deck.