So after the framing and bulkheads it was plaster fixing, and then setting and more setting and then some more. Because a track system was used and new tracks and sheet sizes used and packed the cosmetic work took a bit longer.
Kitchen install pre 2pac.
Kitchen fit off pre floor sanding and polish and light fit off.
External cladding fix out.