The Process

Upon closer observation it was discovered that the timber flooring in the kitchen laundry area had been scored and damaged. It was scattered and to try to repair it would have been a false economy.

IMG_6585 IMG_6609

We started laying the floor and installing the laminated beams and post into position.

IMG_6612

 

IMG_6525

IMG_6627

Framing and tie down ready for external cladding, electrical,  plumbing and internal plastering

 