Here is my water proofing man sealing the shower cubical the whole floor and areas around the bath and vanity. A hob wall should be used for timber floor houses.
All posts by robert.kaplan
Tiling and grouting
The Result
Task/Process and Result
I was asked by a builder if I could demolish a part of the building that he was going to do a major renovation on. The block was split and the building had to be shifted.
We had to clean out everything from under the house disconnecting all the services. The deck was to be cut back to the internal walls as you will see from the photos. Asbestos had to be stripped out and the house decontaminated before we could start demolishing. Unfortunately I only have few photos but you can see the job at hand. This job was done in a few days with three people.
Selecting Colours / Grains
Cutting The Floor Boards
Installation
I used a secret nail gun to fix the floor boards with Liquid Nails. The floorboards must be placed tight and, where required for expansion, fishing line used for a gap guide.
The Job
I was asked by a former neighbour if I could assist them in their renovations. They had fully gutted their new house in Moorooka internally and needed carpentry work done,walls moved, windows installed, ceiling and wall plastering as well as the finishing off being skirting, architrave and doors. I didn’t take many photos; I only have a few.