The Process

We had cut the concrete for the plumber so that some waste pipes could be installed. All the pre existing copper pipes were replaced. The electrical wiring had to happen and we decided to build a cupboard with the wall cavity so to speak. We used semi framless glass and I built a hob for the soap. We also extended the bulk head over the shower to align with the screen door. I also used chrome quad strip on the corners of the tiled walls.

Leave a Reply

Your email address will not be published. Required fields are marked *