Ship container mezzanine floor welding

The client had a car which they wanted to export. They also had some household goods that they wanted to be included. As the car is small there was a lot of room up on top. So I was instructed to make a self supporting structure to hold the chattels.

I had to ensure that the rocking motion of the seas did not move the entire contents. A steel frame was made out of RHS and was braced with 20mm ply as a platform and struts. The car was strapped into position and the contents on top tied down and blocked by a head board.

The client being a car enthusiast would have killed me if anything had happened to his car like the structure failing or a scratch to the car. I was confident that my work was solid, good that is, but I was also relieaved when I heard that it arrived to its destination un marked.

Below are the photos of the work.

MGB delivered unmarked  House hold contents in ship ctnr container

One thought on “Ship container mezzanine floor welding”

Leave a Reply

Your email address will not be published. Required fields are marked *