The Process

I had to get plates and beams cut close to size by my metal fabricator then I transported all the material on my truck to the work site.

DSC01218

DSC01220

DSC01221

 

Once the steel beams/posts were welded, bolted and chemically  set into place we had to place struts into the webbing of the existing trusses as the load points shifted.

DSC01249

DSC01265

Here we are double platting a floor joist which will be tucked on the outside underside of the floor. We are laminating and leaving space for three tie down rods. Below is the start of our framing.

 

DSC01282

 

DSC01323

Tie down, speed bracing, roof insullation and facia installed.

DSC01303

DSC01310

 